|
Downloads: 5 | Size:
Stakeholder Engagement Plan (SEP) IFPA-CDThe Stakeholder Engagement Plan (SEP) for the Uganda Investing in Forests and Protected Areas for Climate Smart Development (IFPA-CD) project is a comprehensive framework designed to guide inclusive and meaningful interaction with all project stakeholders throughout the project’s lifecycle. It outlines strategies for identifying and analyzing stakeholders—including primary groups like local communities and the marginalized Batwa ethnic group, secondary influencers, and vulnerable populations—and details methods for effective information disclosure, consultation, and feedback. The plan establishes a Grievance Redress Mechanism (GRM) to address concerns and emphasizes principles of free, prior, and informed consultation, ensuring that engagement is accessible, non-discriminatory, and culturally appropriate, particularly for the most vulnerable, to foster project understanding, ownership, and successful implementation. |
||
|
Downloads: 6 | Size:
Project Implementation Manual (PIM) IFPA-CD ProjectThe Uganda Investing in Forests and Protected Areas for Climate Smart Development (IFPA-CD) Project is a Government of Uganda initiative, co-financed by the World Bank, aimed at improving the sustainable management of forests and protected areas while increasing benefits to communities in target landscapes of western and north-western Uganda. Structured around four key components—Improved management of protected areas; Increased revenues and jobs from forests and wildlife; Improved landscape management; and Project management and monitoring—the project focuses on enhancing ecosystem services, generating revenue, and supporting resilient livelihoods, with particular attention to raising the incomes of women and communities in refugee-hosting districts. |
||
|
Downloads: 1 | Size:
Summary – Vulnerable and Marginalized Groups Framework (VMGF) for Uganda – English Version (October 2020) |
||
|
Downloads: 67 | Size:
Advert NPC-IFPA-CD-Project |
||
|
Downloads: 1 | Size:
Process Framework for disclosure |
||
|
Downloads: 5 | Size:
Advert- Project Coordinator NPC-IFPA-CD Project |
||
|
Downloads: 5 | Size:
Occupational Health and Safety MeasuresThe project Occupational Health and Safety Measures aim to provide guidelines on how work will be executed during implementation of IFPA-CD Project to ensure that health and safety of the workers are adequately managed to prevent injuries and loss of lives during the course of employment. Occupational Health and Safety Measures has been developed in a manner consistent with the World Bank’s Environmental and Social Standard (ESS) 2 on Labour and working conditions in addition to relevant GoU legal and regulatory framework, World Bank Group General Environmental Health and Safety Guidelines (WBG EHS Guidelines), International Labour Organisation Conventions and other Good International Industry Practices. |
||
|
Downloads: 5 | Size:
Gender Action Plan for IFPA-CD Project
|
||
|
Downloads: 1 | Size:
Financing Agreement- with signed minutes & Attachments IFPA-CD ProjectFinancing Agreement- with signed minutes & Attachments IFPA-CD Project |
||
|
Downloads: 3 | Size:
Mid-Term Evaluation Report Final – IFPA-CD ProjectThe Mid Term Review (MTR) evaluation was conducted to assess the progress made by the project towards achieving its objectives, identify challenges and opportunities, and make practical recommendations for the project to effectively deliver on its objectives and targets, including any adjustments in scope and implementation as may be deemed necessary. This report summarises the MTR’s main findings, conclusions and recommendations. |
||
|
Downloads: 4 | Size:
Stakeholder Engagement Plan (SEP) for IFPA-CD ProjectThe Stakeholder Engagement Plan (SEP) was prepared at the start of project implementation to guide stakeholder engagement and disclosed in 2021. The SEP defines programs for stakeholder engagement, describes commitments and process for stakeholder engagement and outlines ways in which IFPA-CD project implementation team communicates with stakeholders. It includes mechanisms by which people can raise concerns or make complaints and receive feedback on issues of IFPA-CD project implementation. |
||
|
Downloads: 2 | Size:
Project Brief for IFPA-CD ProjectThe Project Development Objective is to to improve sustainable management of forests and protected areas and increase benefits to communities from forests in target landscapes. |
||
|
Downloads: 3 | Size:
ESMF AF IFPA-CD May 9 2025An Environmental and Social Management Framework (ESMF) outlines mechanisms for the screening of proposed project activities and identified potential environmental and social impacts and their subsequent management. |
||
|
Downloads: 3 | Size:
Project Implementation Manual(PIM) for IFPA-CD ProjectProject Implementation Manual(PIM) for IFPA-CD Project |
||
|
Downloads: 1 | Size:
Grievance Redress Mechanism for IFPA-CD ProjectThe GRM is an inclusive and participatory entity that is aimed at facilitating communication between conflicting parties, promoting dialogue, and facilitating a reasonable agreement between the parties to a grievance. |
||
|
Downloads: 5 | Size:
Forest Partnership and Partnership for Forest Development Project (P4F)Forest Partnership and Partnership for Forest Development Project (P4F) |
||
|
Downloads: 23 | Size:
Final Advert for Early Market engagementThe Republic of Uganda through Ministry of Water and Environment has requested for additional financing from the World Bank toward the cost of Integrated Water Management and Development Project-Additional Financing (IWMDP-AF). The project development objective is to improve access to water supply and sanitation services, capacity for integrated water resources management and the operational performance of service providers in the project areas. |
||
|
Downloads: 10 | Size:
RAPs for Laropi Gwere Edrayo Ewanga…RAP for Laropi, Gwere, Edrayo, Ewanga, Pajakiri, Awoba, Goboro, Lobe, Lomunga, Nyori, Rodo. |
||
|
Downloads: 6 | Size:
Adjumani and Lamwo RAP ReportRESETTLEMENT ACTION PLAN FOR LARGE SOLAR POWERED PIPED WATER SUPPLY SYSTEM AND SANITATION FACILITIES IN SELECTED RGCs IN ADJUMANI AND LAMWO DISTRICTS |
||
|
Downloads: 3 | Size:
Strip Maps, Valuation Reports/MatrixStrip Maps, Valuation Reports and Valuation matrix for Bugwara, Kabamba, Kasese, Kikoora, Lwentulege and Mwitangize Water supply and Sanitation Projects |
||
|
Downloads: 7 | Size:
ESIA REPORT FOR NYAMUGASANI WSS- KASESE DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF NYAMUGASANI WATER SUPPLY AND SANITATION SYSTEM IN KASESE DISTRICT, UGANDA |
||
|
Downloads: 3 | Size:
ESIA REPORT FOR MWITANZIGE WSS-KAKUMIRO DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE PIPED WATER SUPPLY AND SANITATION SYSTEM FOR MWITANZIGE RURAL GROWTH CENTRE IN MWITANZIGE SUB-COUNTY, KAKUMIRO DISTRICT, UGANDA |
||
|
Downloads: 3 | Size:
ESIA REPORT FOR LWENTULEGE WSS-RAKAI DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE PIPED WATER SUPPLY AND SANITATION SYSTEM FOR LWENTULEGE RURAL GROWTH CENTRE IN KAGAMBA SUB-COUNTY, RAKAI DISTRICT, UGANDA |
||
|
Downloads: 2 | Size:
ESIA report for Kitenga RGC- Kaliro districtEnvironmental and Social Impact Assessment(ESIA) Report for Kitenga RGC Kaliro District. |
||
|
Downloads: 3 | Size:
IWMDP Kiryandongo Mutunda Final ESIAESIA FOR THE PROPOSED LARGE SOLAR POWERED PIPED WATER SUPPLY AND SANITATION SYSTEM IN MUTUNDA RURAL GROWTH CENTRE, KIRYANDONGO DISTRICT |
||
|
Downloads: 4 | Size:
ESIA REPORT FOR KIKOORA WSS- KAKUMIRO DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE PIPED WATER SUPPLY AND SANITATION SYSTEM FOR KIKOORA RURAL GROWTH CENTRE IN KAKINDO SUB-COUNTY, KAKUMIRO DISTRICT, UGANDA |
||
|
Downloads: 3 | Size:
ESIA REPORT FOR KIKOOGE WSS- NAKASONGOLA DISTRICTESIA FOR THE PIPED WATER SUPPLY SYSTEMS IN KIKOOGE RGC IN BUDYEBO COUNTY, LWEBIYATA SUBCOUNTY IN NAKASONGOLA DISTRICT |
||
|
Downloads: 1 | Size:
ESIA REPORT FOR KIKONGE-NAKASERO- KYANKWANZI DISTRICTESIA FOR THE PIPED WATER SUPPLY SYSTEMS IN KIKONGE-NAKASERO RGC IN KIBOGA COUNTY, BANANYWA SUBCOUNTY IN KYANKWANZI DISTRICT |
||
|
Downloads: 1 | Size:
ESIA report for Kidera RGC- Buyende districtENVIRONMENT AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR THE SOLAR OWERED PIPED WATER SUPPLY SYSTEM AND SANITATION FACILITY IN KIDERA RURAL GROWTH CENTRE BUYENDE DISTRICT – EASTERN UGANDA |
||
|
Downloads: 2 | Size:
RESETTLEMENT ACTION PLAN (RAP) FOR NYAGAK WSSRESETTLEMENT ACTION PLAN (RAP) FOR THE PROPOSED NYAGAK WATER SUPPLY SYSTEM IN ZOMBO, NEBBI & MADI OKOLLO DISTRICTS |
||
|
Downloads: 2 | Size:
RESETTLEMENT ACTION PLAN (RAP) FOR ENYAU WSSRESETTLEMENT ACTION PLAN (RAP) FOR ENYAU WATER SUPPLY SYSTEM IN TEREGO & YUMBE DISTRICTS |
||
|
Downloads: 2 | Size:
ESIA REPORT FOR KASESE WSS-RAKAI DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE PIPED WATER SUPPLY AND SANITATION SYSTEM FOR KASESE RURAL GROWTH CENTRE IN KIZIBA SUB-COUNTY, RAKAI DISTRICT, UGANDA |
||
|
Downloads: 2 | Size:
ESIA report for Igwaya RGC-Buyende districtENVIRONMENT AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR LARGE SOLARPOWERED |
||
|
Downloads: 1 | Size:
ESIA report for Bukizibu Bumwena RGC-Mayuge districtPROPOSED LARGE SOLAR-POWERED PIPED WATER SUPPLY SYSTEMS AND SANITATION FACILITIES IN BUKIZIBU – BUMWENA IN MAYUGE DISTRICT ENVIRONMENTAL AND SOCIAL IMPACT |
||
|
Downloads: 1 | Size:
ESIA REPORT FOR BUGWARA WSS-KAGADI DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED CONSTRUCTION OF THE PIPED WATER SUPPLY AND SANITATION SYSTEM FOR BUGWARA RURAL GROWTH CENTRE IN KICUCURA SUB-COUNTY, KAGADI DISTRICT, UGANDA |
||
|
Downloads: 1 | Size:
ESIA REPORT FOR BUGOMOLWA WSS-KYANKWANZI DISTRICTENVIRONMENT AND SOCIAL IMPACT ASSESSMENTREPORT (ESIA) FOR THE PIPED WATER SUPPLY SYSTEMS IN BUGOMOLWA RGC IN NTWETWE COUNTY, NKANDWA SUBCOUNTY IN KYANKWANZI DISTRICT |
||
|
Downloads: 1 | Size:
IWMDP Kiryandongo Nyakabale Final ESIAENVIRONMENT AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR THEPROPOSED LARGE SOLAR POWERED PIPED WATER SUPPLY AND SANITATION SYSTEM IN NYAKABALE RURAL GROWTH CENTRE, KIRYANDONGO DISTRICT |
||
|
Downloads: 4 | Size:
IWMDP Kiryandongo Gaspa Final ESIAENVIRONMENT AND SOCIAL IMPACT ASSESSMENT (ESIA) FOR THE PROPOSED LARGE SOLAR POWERED PIPED WATER SUPPLY AND SANITATION SYSTEMS IN GASPA RURAL GROWTH CENTRE, KIRYANDONGO DISTRICT |
||
|
Downloads: 3 | Size:
BITSYA FINAL ESIA REPORT- BUHWEJU DISTRICTENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION OF BITSYA WATER SUPPLY AND SANITATION SYSTEM IN BUHWEJU DISTRICT, UGANDA |
||
|
Downloads: 6 | Size:
Lugala Detailed Design Report.pdfDetailed Design Report – Lugala RGC |
||
|
Downloads: 3 | Size:
Kitenga Detailed Design ReportDetailed Design Report – Kitenga RGC |
||
|
Downloads: 1 | Size:
ESIA -REPORT FOR LUBAALI WSS- KASANDA DISTRICTENVIRONMENT AND SOCIAL IMPACT ASSESSMENT REPORT (ESIA)FOR THE PIPED WATER SUPPLY SYSTEMS IN LUBAALI RGC IN BUKUYA COUNTY, KITUMBI SUBCOUNTY IN KASSANDA DISTRICT |
||
|
Downloads: 5 | Size:
Bukizibu Bumwena Detailed Design Report.pdfDetailed Design Report – Bukizibu Bumwena RGC |
||
|
Downloads: 6 | Size:
Final Cleared ESMP annexed to the Financing Agreement (FA)_MWACRID-P Cleared. |
||
|
Downloads: 6 | Size:
Environmental & Social Management Plan (ESMP)Environmental & Social Management Plan (ESMP)
|
||
|
Downloads: 12 | Size:
STAKEHOLDER ENGAGEMENT PLAN (SEP) MWACRIDMULTI-PURPOSE WATER FOR CLIMATE RESILIENCE AND IRRIGATION DEVELOPMENT FOR LIVELIHOOD TRANSFORMATION (MWACRID) PROJECT IN THE SUB-COUNTIES OF MASINDI-PORT AND KIGUMBA IN KIRYANDONGO DISTRICT; MIRYA AND KIMENGO IN MASINDI DISTRICT, UGANDA, STAKEHOLDER ENGAGEMENT PLAN |
||
|
Downloads: 20 | Size:
ONGOING CLIMATE CHANGE PROJECTSONGOING CLIMATE CHANGE PROJECTS |
||
|
Downloads: 6 | Size:
Final ESIA-MWACRID ProjectENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT FOR THE ROPOSED MULTI-PURPOSE WATER FOR CLIMATE RESILIENCE AND IRRIGATION DEVELOPMENT FOR LIVELIHOOD TRANSFORMATION (MWACRID) PROJECT IN THE SUB-COUNTIES OF MASINDI-PORT AND KIGUMBA IN KIRYANDONGO DISTRICT; MIRYA AND KIMENGO IN MASINDI DISTRICT, UGANDA |
||
|
Downloads: 4 | Size:
Combined Notification to the Riparian States for MWACRIDCombined Notification to the Riparian States for MWACRID. |
||
|
Downloads: 8 | Size:
CATCHMENT MANAGEMENT PLAN for NGENGE IRRIGATION SCHEMECATCHMENT MANAGEMENT PLAN for NGENGE IRRIGATION SCHEME |
||
|
Downloads: 2 | Size:
CATCHMENT MANAGEMENT PLAN for TOCHI IRRIGATION SCHEMECATCHMENT MANAGEMENT PLAN for TOCHI IRRIGATION SCHEME |
||
|
Downloads: 1 | Size:
CATCHMENT MANAGEMENT PLAN for MUBUKU II IRRIGATION SCHEMECATCHMENT MANAGEMENT PLAN for MUBUKU II IRRIGATION SCHEME |
||
|
Downloads: 1 | Size:
CATCHMENT MANAGEMENT PLAN for DOHO II IRRIGATION SCHEMECATCHMENT MANAGEMENT PLAN for DOHO II IRRIGATION SCHEME |
||
|
Downloads: 5 | Size:
List of Clean Development Mechanism CDM Projects in UgandaThe Clean Development Mechanism (CDM), defined in Article 12 of the Protocol, allows a country with an emission-reduction or emission-limitation commitment under the Kyoto Protocol (Annex B Party) to implement an emission-reduction project in developing countries. Such projects can earn saleable certified emission reduction (CER) credits, each equivalent to one tonne of CO2, which can be counted towards meeting Kyoto targets. The mechanism is seen by many as a trailblazer. It is the first global, environmental investment and credit scheme of its kind, providing a standardized emissions offset instrument, CERs. |
||
|
Downloads: 3 | Size:
IFPA-CD-Magazine Article for UWEWKIFPA-CD, Uganda’s Conservation Success: |
||
|
Downloads: 5 | Size:
EPRP (MWACRID)- For Disclosure |
||
|
Downloads: 2 | Size:
TC 002 Rev _Edited EPRP (MWACRID)- Clean copy with Residual comments 10.07.2025 |
||
|
Downloads: 19 | Size:
Simu Muyembe Community Based Wetland Management Plan 2025-2035The Simu- Muyembe community-based management plan (CBWMP) is developed under the “Strengthening Adaptive Capacity and Resilience of Communities in Uganda’s Watersheds – Awoja |
||
|
Downloads: 16 | Size:
Komirya Community Based Wetland Management Plan 2025-2035The communities around Komirya wetland, civil society organizations, traditional and political leadership of the six sub counties of Kongunga, Aligoi, Kocheka, Kolir, Aminit, and Kachumbala and Bukedea District Local Government provided invaluable information about wetlands management issues and contributed greatly to designing appropriate management and conservation strategies |
||
|
Downloads: 11 | Size:
Nalugugu Community Based Wetland Management Plan 2025-2035The Nalugugu community based management plan (CBWMP) is developed under the “Strengthening the Adaptive Capacity and Resilience of Communities in Uganda’s Watersheds in |
||
|
Downloads: 7 | Size:
About FIEFOC IIIThe Government of Uganda through the Ministry of Water and Environment (MWE) is implementing the development of three- medium sized irrigation schemes in northern and eastern regions of Uganda, covering an irrigable area of 1,800 |
||
|
Downloads: 119 | Size:
Final ToR for Grant Officers-ITBACKGROUND |
||
|
Downloads: 137 | Size:
Final ToR for Grant Officers 1BACKGROUND The Government of Uganda (GOU) represented by the Ministry of Water and Environment |
||
|
Downloads: 62 | Size:
advert for pipe network |
||
|
Downloads: 18 | Size:
Annex 09-Biomass Degradation in Uganda |
||
|
Downloads: 6 | Size:
Chapter 1 Introduction |
||
|
Downloads: 5 | Size:
Chapter 2 Lake monitoring |
||
|
Downloads: 4 | Size:
Chapter 3 Hydro-met conditions |
||
|
Downloads: 3 | Size:
Chapter 4 non-point |
||
|
Downloads: 4 | Size:
Chapter 5 Industrial and municipal |
Official Website of the Ministry of Water and Environment

