Final ToR for Second Beneficiary Satisfaction Survey 2026
TERMS OF REFERENCE FOR BENEFICIARY AND STAKEHOLDER SATISFACTION SURVEY FOR IWMDP 2026
TERMS OF REFERENCE FOR BENEFICIARY AND STAKEHOLDER SATISFACTION SURVEY FOR IWMDP 2026
The ministry of Water and Environment invites suitably qualified individuals with qualifications and experience to apply for the under listed positions.
IMPLEMENTATION OF PRIORITY CATCHMENT MANAGEMENT MEASURES IN 4 LOTS: LOT 1: MUTUNDA SUB-CATCHMENT
CONSTRUCTION OF KYEGEGWA – MPARA – RUYONZA - KYAKA -KABAGORE PIPED WATER SUPPLY AND SANITATION SYSTEM IN TWO (2) LOTS.
CONSTRUCTION OF SOLAR POWERED WATER SUPPLY AND SANITATION SYSTEMS IN THREE (3) LOTS: LOT 1: CONSTRUCTION OF 4No. RGCs OF EWANGA (MADI OKOLLO), EDRAYO(TEREGO), RODO(YUMBE) AND NYORI(YUMBE), LOT 2: CONSTRUCTION OF 4No. RGCs OF BULANGE(NAMUTUMBA),NANGO(MAYUGE), BUBUGO(JINJA) AND KAGUMBA(KAMULI) AND LOT 3: CONSTRUCTION OF 5No. RGCs OF KASABA(KYENJOJO), RWENTUHA(KYEGEGWA),BUBANDA(MUBENDE), KYAMPANGARA(KAZO) AND NYAMUSHOJWA(KAZO). REF NO: MWE/WRKS/25-26/00006